CASE STUDIES
CASE STUDIES
Read through the case studies in your area to see how TTS Drilling Solutions’ innovative technology is helping customers “Reach TD”.
Fit for Purpose
TTS Drilling Solutions offers customizable solutions to meet your operational requirements.
CASING XRV
Casing XRV™ Excels Through Harsh Horizontal Section.
TTS’ Casing XRV™ ran casing to bottom in 12 hours.
Pleased Customer Requests Casing XRV™ On Every Well.
TTS’ Casing XRV™ aided in running casing to bottom after multiple sidetracks.
TTS’ Casing XRV™ assisted in casing and cementing a hole in 36 hours.
Completion String Installed with Drillable Casing XRV™
TTS’ Casing XRV™ aids in Running Casing thru Severe Deviation
TTS’ Casing XRV™ Excels When Run with a Packer/Sleeve System
TTS’ Casing XRV™ Improved Cement Bond on Intermediate for Multi-Lateral Well
DRILLING XRV
Two XRV PLUS™ Tools Utilized to Maintain ROP in a Long Lateral
XRV PLUS™ Becomes Customers Tool of Choice
XRV PLUS™ Excels in Long Lateral.
XRV PLUS™ was able to increase penetration rate by 100%.
XRV PLUS™ Increased ROP with a Pressure Drop of 235 PSI.
XRV PLUS™ saves time and money while greatly improving performance
XRV PLUS™ outperforms competitor in head-to-head comparison.
XRV PLUS™ Increase Sliding ROP 300%
XRV PLUS™ Maintains Sliding ROP to TD.
XRV PLUS™ Helps Extend Bit Life while Increasing ROP.
XRV PLUS™ excels after 16 days in hole.
Customer Drills 4,500’ in 24 Hours with XRV™
Operator’s Fastest Curve and Lateral
Lateral Run Results
Rig’s Fastest Southern Utica Well
XRV™ Provides 300% Faster ROP than Competition
XRV™ helps drill longest lateral ever drilled in a single day
